First page Back Continue Last page Overview Graphics
To Do: Leverage the existing network.
- Run the existing rail infrastructure more efficiently
- Maximise patronage to operating cost ratio
- Faster running with less timetable slack
- Build on existing infrastructure with incremental improvements